During 2006/07 the mechanical removal of azolla from channels was trialled, using a primary elevator to lift the floating Azolla from within a weir gate opening to a conveyor belt for deposition on shore outside of the weir perimeter fence.
Last updated: 22 Dec 2010
Copyright © 1997-2012 Goulburn-Murray Water. ABN 46 761 336 846. All rights reserved.